pH of the prepared bath: approx. 4.0 – 5.0
Pick-up: approx. 40 – 80%, depending on the fiber
Bath temperature: about 20 – 25 °C
Drying temperature: 110 – 130 °C
Separate curing: 5 min at 150 °C on curing machine
Rapid curing process: 45 – 60 sec at 110 – 170 °C in stages (stenter)